HEALTH & SAFETY

SAFE LIFTING STARTS BEFORE THE CRANE ARRIVES.

At Banks Crane and Transport, safe lifting starts with proper planning, suitable equipment, experienced people and site-specific controls. We work through the job before lifting begins so the crane, load and site are ready to work together.

PLAN. CONTROL. LIFT.
LIFT PLANNING SITE CONTROLS COMPETENT PEOPLE
LIFT PLANNING & SWMS

REAL PLANNING.
REAL DOCUMENTATION.

We can provide lift plans, SWMS and supporting safety documentation where required. Planning is matched to the lift, the site and the project requirements.

LIFT PLANS SWMS SITE PLANNING
Banks Crane and Transport team member wearing site PPE
SAFETY IN PRACTICE

THE RIGHT PEOPLE. THE RIGHT EQUIPMENT.

Safe lifting depends on more than the crane. Experienced lifting personnel, clear communication, appropriate PPE and properly maintained equipment all form part of getting the job ready.

Competent lifting personnel
Pre-starts and site briefings
Required PPE
Plant inspections and maintenance
03 SITE MARKUP Banks Crane and Transport site planning and lift markup example CLICK TO VIEW FULL SIZE
SITE-SPECIFIC PLANNING

EVERY SITE IS DIFFERENT.

Access, crane position, working radius, surrounding structures and the final load position can all affect how a lift needs to be planned.

Where required, we can use site plans, drawings, photos and markups to help work through the lifting setup before the crane arrives.

CRANE POSITION WORKING RADIUS ACCESS LIFT AREA
PROJECT DOCUMENTATION

NEED H&S DOCUMENTATION FOR YOUR JOB?

If your site or project team needs lift plans, SWMS, plant information or supporting health and safety documentation, let us know what is required.